The True Cost of Downtime in Equipment Moves — And How to Avoid It
When you’re relocating machinery, time is money, and downtime is the enemy.
The Planning Gap That Stalls Industrial Equipment Relocations
That “too good to be true” relocation quote?
It usually is.
When Plans Shift: How to Handle a Mid-Project Scope Change During a Facility Move
Scope changes are inevitable. But how you handle them determines whether your move stays on track or goes sideways.
Heavy Lifts, Tight Spaces: How to Manage Machinery Moves in Legacy Plants
Industrial equipment is getting bigger. Facilities? Not so much.
The Hidden Complexity Behind a "Simple" Equipment Move
What looks routine can quickly spiral into six figures without the right plan.
The True Cost of Cheap: Why the Lowest Bid Might Be Your Most Expensive Mistake
In the world of industrial relocation, it’s easy to be lured by the lowest number on a proposal.
7 Questions Every Manufacturer Should Ask Before a Facility Move
It’s not just about moving equipment, it’s about safeguarding uptime, capital investments, safety, and production continuity.
Safety Isn’t a Department, It’s Built Into Our Culture
In our industry, safety isn’t optional. It’s everything.
5 Things to Check Before Hiring an Equipment Mover
Hiring an equipment mover? Here are 5 critical checks before you sign:
How We Help Minimize Production Interruption During a Move
Downtime isn't just costly, it’s disruptive to everything: schedules, teams, customer delivery, and revenue.
5 Ways Equipment Damage Happens During a Move — And How to Prevent It
When relocating industrial equipment, damage isn’t always dramatic. It can be subtle, costly, and easy to miss until it’s too late.
Free Facility Relocation Audit: Let’s Map the Right Move
Relocating a facility isn’t just a logistical task, it’s a high-stakes operation with huge consequences for cost, downtime, and safety.
What to Expect During a Henke Walkthrough
A facility walkthrough isn’t just a preliminary step, it’s one of the most important moments in a successful equipment relocation.